The Nelson Mandela Foundation and RIDE4HOPE launch Mandela Month
The Foundation, in conjunction with RIDE4HOPE, marked the occasion by launching Mandela Month at Avianto in Muldersdrift, north of Johannesburg.
The Foundation, in conjunction with RIDE4HOPE, marked the occasion by launching Mandela Month at Avianto in Muldersdrift, north of Johannesburg.
Availability and affordability are the two major barriers preventing people from gaining access to modern energy services. Millions of people live in places that are disconnected from electricity grids where off-grid solutions are not yet available to them. Millions more might be able to access electricity or clean cooking solutions, but the price of doing so is beyond their means.
With this change, the chairpersons of the regional management committees (MC),
Guillaume Cartier, senior vice president (SVP), MC AMIEO (Africa, Middle East, India,
Europe and Oceania); Jérémie Papin, SVP, MC Americas; and Shohei Yamazaki, SVP, MC
China will become members of the executive committee and will report directly to Makoto
Uchida, CEO.
This development was made known by the company’s Chief Executive Officer, Mokhtar Bounour, who disclosed that the record-breaking result was made achievable through the support and cooperation of industry operators and stakeholders.
They presented the results of their latest study which investigates Senegal’s optimal power system expansion. The study revealed that speeding up the deployment of renewable energy beyond what is currently planned will lead to a staggering $700 Millions of savings until 2035, primarily
During the Gastech 2023 Strategic Conference, global energy leaders will share insights on the investment landscape required to stimulate adequate funding on both new and existing energy production as well as next generation energy solutions and climate technologies. Shifts in financing strategies, a changing appetite for risk and a demand for greater flexibility are transforming partnership models.
The GEI CCS database not only highlights existing CCS projects but also provides valuable information on the potential for future CCS development. It includes data on geological storage sites, infrastructure requirements, and stakeholders, facilitating the identification of opportunities and challenges associated with CCS implementation.
It leaves industrials with a twin challenge to meet. First and foremost, they need to secure their own reliable and affordable power capacity either by buying electricity from an independent power producer or by building their own “captive” plant. Second, they need to integrate decarbonisation in their overall energy strategy. Both objectives are not contradictory. By making smart technology choices, forward looking businesses like BUA Cement, African Foundries, Lafarge, Wempco, Nestle and Flour Mills have found a way to hit these two birds with one stone. Here is how.
The President of Cables Manufacturers Association of Nigeria has scored the Standards Organisation of Nigeria (SON) high on enforcing regulations and maintaining high standards in Nigeria’s cable Industry. Ms. Bukola Adubi, who is also the chief operating officer (COO) of MicCom Cables, made the commendation during a monitored radio program. She however called on SON…
“As a forward thinking, innovative and customer centric organization, the Singleview 2.0 enables customers to have all necessary information at the tips of their fingers including how they can resolve issues and make enquiries without necessarily visiting or calling Ikeja Electric’s offices” He said.