Wärtsilä to supply added generating capacity and existing plant upgrade for repeated Egyptian customer
The Borg El Arab plant currently operates with four Wärtsilä 34SG engines running on natural gas, the cleanest of all widely available fuels. As a result of increased industrial demand for electricity in the region, additional generating capacity is needed, and because of the reliability of the existing operation, an additional two Wärtsilä 34SG engines was deemed to be the optimal solution.