Gas leakage responsible for shutdown of four power plants, says TCN
THE Transmission Company of Nigeria (TCN) at the weekend, disclosed that a leakage on the Escravos-Lagos gas Pipeline had led to the shutdown of four power generating plants last Wednesday. As a result, it said power generated to the national grid reduced due to emergency maintenance conducted by the Nigerian Gas Company (NGC) on the…