TCN upgrades Egbin 330/132/33kV Substation with 60MVA 132/33kV power transformer

By Oke Peter

The Transmission Company of Nigeria (TCN) has upgraded its Egbin 330/132/33kV Transmission Substation with the installation of a 60MVA 132/33kV power transformer. The transformer which was installed by TCN in-house engineers was energized at about 13.05pm on the 2nd of March 2022.

A cross section of the Transmission Company of Nigeria in-house engineers after the installation of the power transformer.

According to a statement released on Sunday by the General Manager, Public Affairs, Mrs Ndidi Mbah, with the new 60MVA power transformer, the substation capacity to supply bulk electricity to Ikeja Electricity Distribution company has increased by 30MVA. This is because TCN has decommissioned an old 30MVA transformer within the substation, which will be serviced and moved to other areas within its network that has a history of minimal electricity demand.

“This substation capacity upgrade will ensure that more power is made available for IKEDC to take to its franchise areas within Ijede LCDA and Ikorodu Local Government area axis.”

Leave a Reply