NNPCL postpones Port Harcourt refinery kick-off sixth time
It was observed that promises made to Nigerians by the Federal Ministry of Petroleum Resources and NNPC about the refinery have continued to witness multiple failures.
It was observed that promises made to Nigerians by the Federal Ministry of Petroleum Resources and NNPC about the refinery have continued to witness multiple failures.
The blocks are classified into Oil Prospecting Licence and Oil Mining Licence. An OPL is granted by the government to an applicant company registered for exploration and production purposes,
The 614km connection will advance domestic and regional gas utilisation for power generation and industrial development.
Eterna Plc has joined the growing list of domestic sales distributors of Dangote Petroleum Refinery products.
For Area 5, the Engineering, Procurement, Construction, and Installation have all been completed. The mechanical completion signifies the closure of the Construction and Installation phases.
The inauguration of drilling operations at the Kolmani River Oil Field that straddles Gombe and Bauchi states and with estimated reserves of over one billion barrels of crude potentially diversifies oil production from the Niger-Delta and brings the country closer to its ambition of growing crude oil reserves to 40 billion barrels.
The 4-kilometre (2.5-mile) connection from the Forcados export terminal, which typically exports around 250,000 barrels per day (bpd) of oil, into the sea was found during a clamp-down on theft in the past six weeks.
“It will, of course, conduct itself under the best international business practice in transparency, governance, and commercial viability.”